Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I am not seeing 50m in that let alone 300m.I think you will be disappointed CC.
$110M gets you nothing especially given it's government funding. That means there needs to be a strategic business case raised and presented for consideration and approval etc - that is all included in the capital budget so by the time the consultants get it done they will chew through around $2M. Add in 2.5 to 3% per annum in CPI and that will reduce the buying power in real terms by around $10M. So by the time construction comes around we will be looking at $44M for LO and $55M for CAmbo.
I struggled to find something current, in real $ terms, that equates to what we are looking at. The closest I could find, that is publicly available, is the Queensland Government funding of a $62.78 million redevelopment of Browne Park (Rockhampton, QLD) to provide a fit-for-purpose regional facility.
Browne Park Redevelopment
Based on what it is costing the QLD governemnt in today's $ we are likely to see:
For $309M Penrith will end up with:
- Seating Capacity Upgrade:
Replace a single grandstand with a three-level 3,500-seat grandstand featuring a roof with improved sightlines, new seating to meet current accessibility compliance (ramps/lifts).- Facilities Modernisation:
New player change rooms (M/F), recovery and medical facilities, referees’ rooms, and upgraded media/press facilities.- Spectator Amenities:
Improved food/beverage outlets, upgraded toilets, family-friendly zones.- Technology & Safety:
LED lighting to broadcast standard, upgraded big screens, improved PA/security systems.- Partial Roof Structures:
Roof coverage for parts of the redeveloped stand, but not full coverage across the stadium.
So when you look at it in the bigger picture for Wests Tigers the players and corporates will get much better facilities and there will be some improved seating, toilet facilities and disabled access to meet modern requirements along with better food delivery capabilities. The rest of the grounds will get some new lipstick.
- New western stand including improved:
- player facilities catering for both male and female sports
- visitor amenities
- food and beverage areas
- grandstand seating.
- New eastern stand, including:
- spectator amenities
- food and beverage areas
- grandstand seating.
- Refurbished and new stadium entries on the northern and western boundaries.
- Upgrades to the existing western training field to create:
- a dedicated player warm-up area
- an activation hub at the western entry to the stadium
- additional event day car parking.
what decade do you think it is ,I am not seeing 50m in that let alone 300m.
Sure Toilets and showers are a PITA. But you building them for a stadium where you set it out in Bulk.. I.e. rows of showers, not like our bathrooms. A home Bathroom, done right is around the 25k mark. Yes you need to waterproof, tile, test and all the rest. It's a 100k job, not a 1m job.
Sure LED lighting and proper sound systems cost money. Yet not that much, were talking maybe 400k, if top notch 1m.
Add ramps for the disabled. Great! lay concrete at an incline... Yes your concreters are expensive but how damn complex is a ramp? Really??
50m is Issac Moses doing the bricklaying or something?
(Sorry I just don't get it, you may agree or disagree... I still don't get it. Seems like a colossal markup when a good brainy site manager would get it done for far less.).
BRILLIANT coivtny 👏👏👏👏😆😆😆😆.Or you could save yourself time and anxiety and raise the average IQ of the country and drop off the perch yourself. Just a thought.
You don't have a site manager running it - a Govt contract will have a Head Contract/Managing Contract in place where they are taking a cut, meeting all of the Govt reporting requirements etc. You may not see it but if you look at the Qld Project I linked you too that is the cost.I am not seeing 50m in that let alone 300m.
Sure Toilets and showers are a PITA. But you building them for a stadium where you set it out in Bulk.. I.e. rows of showers, not like our bathrooms. A home Bathroom, done right is around the 25k mark. Yes you need to waterproof, tile, test and all the rest. It's a 100k job, not a 1m job.
Sure LED lighting and proper sound systems cost money. Yet not that much, were talking maybe 400k, if top notch 1m.
Add ramps for the disabled. Great! lay concrete at an incline... Yes your concreters are expensive but how damn complex is a ramp? Really??
50m is Issac Moses doing the bricklaying or something?
(Sorry I just don't get it, you may agree or disagree... I still don't get it. Seems like a colossal markup when a good brainy site manager would get it done for far less.).
Another Excellent post from B2T 👍👍👍👍😃😃😃😃.That was quite possibly the most incoherent post I’ve ever read. But congrats on the entertainment value.
Firstly, your grasp of geography is interesting. Yeah mate, Terrigal, just south of Nambucca Heads 🤣🤣🤣
could you plz post a photo of the example you makeYou don't have a site manager running it - a Govt contract will have a Head Contract/Managing Contract in place where they are taking a cut, meeting all of the Govt reporting requirements etc. You may not see it but if you look at the Qld Project I linked you too that is the cost.
$50M won't go far.
Campbelltown blows. The stadium and the area. Miserable place.
I notice you keep using words like “if’ and “could”. What’s the point on dwelling if you can’t even say for sure.I am a season ticket gold member since 2000 for all grounds, some I sit next to at LO since 2000 do not have CSS membership seating.
if membership drops off from an 8 game move to CSS, then the move will not be a success.
I will still be keeping a membership to go to all grounds
hope redevelopment of both grounds work out ok
Richo has pulled the right rein on everything since he has been hereI notice you keep using words like “if’ and “could”. What’s the point on dwelling if you can’t even say for sure.
You can’t please everyone 🤷🏻♂️Richo has pulled the right rein on everything since he has been here
this will be his first mistake
those crowds last year were against strong sydney clubs, like when parramatta plays at LO they bring the crowd.
You don't have a site manager running it - a Govt contract will have a Head Contract/Managing Contract in place where they are taking a cut, meeting all of the Govt reporting requirements etc. You may not see it but if you look at the Qld Project I linked you too that is the cost.
$50M won't go far.
Yeah I agree with that - the club has done such a rubbish job of connecting with the south-west throughout its first 25 years, it really has to start from now. Any goodwill Western Suburbs were able to generate during their 1987-2000 tenure has been p*ssed down the drain by certain factions within the JV.What you say might have substance…but it’s the past … this commitment is not about the magpies fans from 25 years ago as harsh as that might seem …the audience they should be targeting in the South West now, will have little or no recollections of when the Wests Magpies were still around in the top grade
That’s a sweeping statement.Wests fans had their team uprooted from the inner west years ago and they never made anything of it.
The inner city suburban grounds are steeped in tradition, memories and history and trying to put that to the side while making the case that new migrants to the South West are going to prop up the club in future is short sighted...there's way more competition from the Bulldogs, Penrith, Souths, Parra by moving out that way. This population growth will be spread amongst them.
Go to the inner west and it is and always has been Tigers.
We will see though...not death riding it, just saying if you forego your tradition and something that people love, you might not get the support you think you will.
Look I get it. It's 2025 which is why some things are more expensive.what decade do you think it is ,
It's not the manager though.You don't have a site manager running it - a Govt contract will have a Head Contract/Managing Contract in place where they are taking a cut, meeting all of the Govt reporting requirements etc. You may not see it but if you look at the Qld Project I linked you too that is the cost.
$50M won't go far.
This post highlighted something I’d previously not thought a lot about. Wests people have experienced relocation before, whereas Balmain types feel horribly threatened by any sniff of change.Wests fans had their team uprooted from the inner west years ago and they never made anything of it.
The inner city suburban grounds are steeped in tradition, memories and history and trying to put that to the side while making the case that new migrants to the South West are going to prop up the club in future is short sighted...there's way more competition from the Bulldogs, Penrith, Souths, Parra by moving out that way. This population growth will be spread amongst them.
Go to the inner west and it is and always has been Tigers.
We will see though...not death riding it, just saying if you forego your tradition and something that people love, you might not get the support you think you will.